English

Case study: Performing Power Quality Studies and Troubleshooting Loads

Power quality

Download PDF: Case Study: Performing Power Quality Studies and Troubleshooting Loads »

Tool: Fluke 1735 Three-Phase Power Logger

Profile: Mac McArthur, power quality consultant

Tests performed: Tracing and isolating harmonics; verifying voltage drops.

Working from his offices in Puyallup, Washington, just east of Tacoma, Mac McArthur performs power quality studies for commercial, industrial, and residential clients. He also serves as an agent for the commissioning of electrical systems in new buildings and the retro-commissioning of older buildings.

Prelude to a Power-Logger Purchase

In late 2006, McArthur found himself in the middle of a challenging assignment. The subject of his investigation was a facility that makes corrugated paperboard and whose electrical load was handled by a 1,500 kVA transformer owned by the local utility. The transformer, a 277/480-volt, 4-wire, Wye, had failed because of thermal stress with only a 65 percent load on it. The utility hired McArthur to find the cause of the failure.

"I went in with my basic instruments, including a singlephase power quality analyzer and my Fluke 189 (true-rms) Digital Multimeter, but I ended up renting an expensive power logger - a black box that allowed me to see what was going on, but would not allow me to zero in on just the parameters that interested me," McArthur explains. That meant a lot of data he didn't need, filling up the memory too fast. And without a screen on the unit, he couldn't verify the setup.

Using his instruments and the rented power logger, McArthur determined that the problem was on the customer side of the transformer. Of course, the utility required that the company correct whatever had caused the transformer failure in order to avoid burning up another one. So, the company retained McArthur to diagnose the problem.

McArthur started taking readings at the service entrances and went from there down to the equipment - the individual loads. He found a relatively high dc component being reflected back to the transformer and set about to isolate the source.

Purchasing a Power Logger

While the initial tests, the first upgrade, and subsequent tests pinpointing the second machine took place, McArthur looked for a power logger more suited to this kind of work. He wanted an affordable instrument that would provide the baseline findings he was looking for and provide concise reports on only the parameters that interested him. His search led him to the Fluke 1735 Power Logger, an affordable instrument developed for consultants like him as well as plant electricians and electrical installers, all of whom have occasion to investigate and correct disturbances in power distribution systems and who would benefit from owning, rather than renting, a logger.

Meanwhile Back at the Plant

McArthur obtained a Fluke 1735 Power Logger and put it on the main transformer at the paperboard plant. He then turned off the suspect die cutter and sampled the electrical environment. With the die cutternot running, the second and fourth harmonics were essentially nonexistent. However, when plant personnel turned the machine on, the second and fourth harmonics went from almost zero amps to between six and 13 amps.

Finding the Cause of Voltage Drops

In another case, McArthur used his recently acquired 1735 Power Logger to help a homeowner place the cause of lights dimming and computer screen fluctuations squarely on the shoulders of her electric utility. Because of local zoning laws, McArthur's client was not permitted to tear down her existing home to build a new one. As a result, she added 3,000 square feet to her home. She uses the addition as her primary residence while the older dwelling has become a "mother-in-law apartment" or, in this case, a rental apartment.

The consultant determined that the total calculated load for the two dwellings is 305 amps. The meter base is rated at 400 amps. However, the utility is supplying the housing units with only a single-phase 25 kVA transformer having a full load rating of 104 amps.

"The problem," McArthur reveals, "is that she has a fourton heat pump. Every time the heat-pump motor starts, the locked rotor amps (LRA or motor inrush) is 140 amps. When we considered the fundamental load and did the math, it was pretty clear what we were going to see when the motor started: The lights dim because the instantaneous voltage drop was five or six volts (during each episode)."

The client also reports that depending on the load on the transformer, not only do her lights dim but the computer screen in her home office sometimes shrinks slightly when the heat pump comes on. McArthur explains that utilities often load a 25 kVA transformer up to 200 percent of capacity. He says that the loading on the transformer supplying his client is more than that - 205 or 209 percent at peak times.

The consultant made an agreement with the homeowner that he would monitor the electrical system at the meter base to see "what's being delivered and what the effects are." He attached the power logger for a week's worth of monitored data.

McArthur found that the voltage sags were averaging three percent and happening at a rate of two to three per hour. McArthur believes that his findings will require his client's utility to address the problem and upgrade the transformer, but he also proposes additional tests to augment his findings.

"The 1735 did a beautiful job during the 7-day test," McArthur says. "Using the instrument and its accompanying software, I was able to average events over the two-minute, 20-second sample period. But I want to go back and do at least one more test."

At this writing, the 1735 is so new to McArthur that he is still exploring its capabilities. Still, he anticipates many uses for the 1735 Power Logger in his day-to-day work. He is especially interested in the instrument's ability to log power every 15 minutes for 30 days, on the same schedule that utilities use and the National Electric Code specifies.

Download PDF: Case Study: Performing Power Quality Studies and Troubleshooting Loads »

Welcome to Fluke's Chat GPT Assistant. As with other generative AI systems, this chatbot may occasionally generate incorrect information. For questions regarding the safe use of Fluke tools, please refer to your owners manual. You must comply with your employer’s safety standards and obtain necessary training before using Fluke tools or taking electrical measurements. To speak with a person, visit our Contact Us page.